Transformer factory

win-winHonest and trustworthy, service first

contact number:eight trillion and six hundred and eighteen billion nine hundred and fifty-four million four hundred and ninety-three thousand six hundred and ninety-three

ClarupinadvtavoTransformer voltage stabilizationMarket dominance

Article author:Clarupinadvtavo issuing time:2022/09/22 09:06:01 Reading:41

Visual inspection method for transformer inspection

1The insulation between silicon steel sheets is damaged resulting in overheating and melting of the iron core;

fClarupinadvtavoIf the oil immersed transformer is burned by the cover of the transformer

Visual inspection method for transformer inspection

1The insulation between silicon steel sheets is damaged, when the oil immersed transformer fails, the lower side of the transformer shall be opened and appropriate parts shall be placed. When the oil immersed transformer is on fire, the oil cannot be released to avoid explosion of the oil immersed transformer. At the same time, use detection equipment to put out the fire immediately. In order not to expand the hazard, the fire brigade must be notified.

In order to better avoid transmission overvoltage damage,power transformer price 1000kva a group of overvoltage maintenance high-voltage Arresters (such as ycs active zinc oxide high-voltage arresters) shall be refitted at the working voltage bus duct side of dry-type transformer.

RBussoVisual inspection method for transformer inspection

EaProtection mode for type selection of dry-type test transformer

How to select dry-type transformer


ClarupinadvtavoTransformer



Precautions for trial operation of power transformer manufacturers

pAvoid the load operation of power transformer: if the load operation is long-term,BrentalTransformer three-phase transformerTap the market potential it will lead to the scalding of solenoid coil, slow aging of insulation, two-color short circuit fault or short circuit to ground fault and dissolution of oil.

QThe insulation of the through core anchor bolt clamping the iron core is damaged, resulting in a short circuit fault between the silicon steel sheet of the iron core and the through core anchor bolt;

SBiddingThe insulation between silicon steel sheets is damaged, resulting in overheating and melting of the iron core;

yVThis is the example of power consumption engineering as power saving. The key reason is that the habitual calculation method ignores the copper loss.

After the power transformer has been used for a long time,Power transformer price: 1000KVA, 33kV power transformer, 25kV power transformer, power transformer, oil immersed transformer, dry-type transformer factory common faults of iron core will occur. Dont worry. Contact the transformer manufacturer, and the manufacturer will assign professional technicians for inspection. The main reasons are as follows:


ClarupinadvtavoTransformer



Dry type transformer, a static electrical equipment, is used to change the AC current (current) of a certain standard value into another or several types of working voltage (current) with the same frequency and different standard values. According to the supervision sampling inspection data released by AQSIQ in the third quarter of last year, among the kinds of dry-type transformer commodities produced and manufactured by companies in provinces and municipal districts across the country, kinds of commodities were found to be inconsistent with the provisions of relevant specifications,power transformer price 1000kva kW. Active power loss of small capacity transformer: when a pump room is in normal operation, two pumps are started separately, and each pump is driven by kW motor, so the usual load is KW,BrentalTransformer three-phase transformerTap the market potential CST = . One kva transformer was originally configured

VWhat if an oil immersed transformer catches fire?

According to the introduction of transformer manufacturers, the capacity utilization rate is only about %, which is regarded as & ldquo; Great Lars car & rdquo;, After replacing one kva small transformer,power transformer price 1000kva the utilization rate is close, but the main parameters of the two transformers are evaluated as shown in Table . Table evaluates the main parameters of the transformer: capacity (VA) iron loss (W) copper loss (W). Firstly, the output power is saved according to the customary calculation method (ignoring copper loss): the results show that the loss of large capacity transformer is lower than that of small capacity transformer, It actually consumes electromagnetic energy.

bClarupinadvtavoThe dry-type transformer used for power plant voltage transformation is different from the oil transformer. It is strictly prohibited to lead the way at the bottom voltage side to prevent the transmission overvoltage caused by overvoltage at the power grid side or lightning stroke from penetrating the insulation layer of the dry-type transformer.

oLThis is the example of power consumption engineering as power saving. The key reason is that the habitual calculation method ignores the copper loss.

The cycle time of power-off cleaning and inspection shall be determined according to the surrounding environment and load conditions, generally from half a year to once a year;

Copyright Notice:Transformer factoryProvidedClarupinadvtavoTransformer voltage stabilizationMarket dominanceIt comes from the Internet and is only used for display purposes, and does not guarantee the accuracy, validity, timeliness or completeness of such information. The copyright of some pictures and text still belongs to the original author. If you infringe on your rights, please contact us and we will delete it within 24 hours as soon as possible. We only provide free services, relatedClarupinadvtavoTransformer voltage stabilizationMarket dominanceIt also does not indicate the views or opinions of this website, and has no reference value. Thank you.

    •   +86
    •   +1
    •   +355
    •   +213
    •   +93
    •   +54
    •   +971
    •   +297
    •   +968
    •   +994
    •   +247
    •   +20
    •   +251
    •   +353
    •   +372
    •   +376
    •   +244
    •   +1
    •   +1
    •   +43
    •   +61
    •   +853
    •   +1
    •   +675
    •   +1
    •   +92
    •   +595
    •   +970
    •   +973
    •   +507
    •   +55
    •   +375
    •   +1
    •   +359
    •   +1
    •   +389
    •   +229
    •   +32
    •   +354
    •   +1
    •   +48
    •   +387
    •   +591
    •   +501
    •   +267
    •   +975
    •   +226
    •   +257
    •   +850
    •   +240
    •   +45
    •   +49
    •   +670
    •   +228
    •   +1
    •   +1
    •   +7
    •   +593
    •   +291
    •   +33
    •   +298
    •   +689
    •   +594
    •   +590
    •   +39
    •   +63
    •   +679
    •   +358
    •   +238
    •   +500
    •   +220
    •   +242
    •   +243
    •   +57
    •   +506
    •   +1
    •   +299
    •   +995
    •   +53
    •   +590
    •   +1
    •   +592
    •   +7
    •   +509
    •   +82
    •   +31
    •   +599
    •   +1
    •   +382
    •   +504
    •   +686
    •   +253
    •   +996
    •   +224
    •   +245
    •   +1
    •   +233
    •   +241
    •   +855
    •   +420
    •   +263
    •   +237
    •   +974
    •   +1
    •   +269
    •   +383
    •   +225
    •   +965
    •   +385
    •   +254
    •   +682
    •   +599
    •   +371
    •   +266
    •   +856
    •   +961
    •   +370
    •   +231
    •   +218
    •   +423
    •   +262
    •   +352
    •   +250
    •   +40
    •   +261
    •   +960
    •   +356
    •   +265
    •   +60
    •   +223
    •   +692
    •   +596
    •   +230
    •   +222
    •   +1
    •   +1
    •   +976
    •   +1
    •   +880
    •   +51
    •   +691
    •   +95
    •   +373
    •   +212
    •   +377
    •   +258
    •   +52
    •   +264
    •   +27
    •   +211
    •   +674
    •   +505
    •   +977
    •   +227
    •   +234
    •   +683
    •   +47
    •   +672
    •   +680
    •   +351
    •   +81
    •   +46
    •   +41
    •   +503
    •   +685
    •   +381
    •   +232
    •   +221
    •   +357
    •   +248
    •   +966
    •   +590
    •   +239
    •   +290
    •   +1
    •   +1
    •   +378
    •   +508
    •   +1
    •   +94
    •   +421
    •   +386
    •   +268
    •   +249
    •   +597
    •   +677
    •   +252
    •   +992
    •   +886
    •   +66
    •   +255
    •   +676
    •   +1
    •   +1
    •   +216
    •   +688
    •   +90
    •   +993
    •   +690
    •   +681
    •   +678
    •   +502
    •   +58
    •   +673
    •   +256
    •   +380
    •   +598
    •   +998
    •   +34
    •   +30
    •   +852
    •   +65
    •   +687
    •   +64
    •   +36
    •   +963
    •   +1
    •   +374
    •   +967
    •   +964
    •   +98
    •   +972
    •   +39
    •   +91
    •   +62
    •   +44
    •   +1
    •   +246
    •   +962
    •   +84
    •   +260
    •   +235
    •   +350
    •   +56
    •   +236
5.433064s