KumenCapacity specification of power transformerWhat should be paid attention to during use

Article author:Kumen issuing time:2022/06/22 09:11:51 Reading:53

The cycle time of power-off cleaning and inspection shall be determined according to the surrounding environment and load conditions, generally from half a year to once a year;

9Transformer is a kind of power engineering equipment that converts working voltage and current according to the basic law of magnetic effect of current. In the whole process of power transmission and transformation of power engineering, it is necessary to carry out voltage transformation and blood pressure reduction according to the transformer to reduce the loss in the whole process of electromagnetic energy transmission. Therefore, the power consumption of the processing plant is all connected with kV switching power supply, which is converted into bottom voltage electromagnetic energy through transformer.

aKumenAfter the test, connect the data signal contact of the automobile relay with the alarm circuit,Products Show the pull-in contact with the opening circuit,CologneBuried box transformerAnalysis of the current situation of flaw detection and adjust the overcurrent protection value.

Power saving analysis of transformers has always been based on whether the utilization rate of transformer capacity is less than a certain standard value. Whether transformers are environmental protection and energy saving specifications. In fact, sometimes such specifications are not saving electromagnetic energy but consuming electromagnetic energy.

SHobokenWith Vietnam and Malaysia, Chinas first UHV transmission experimental demonstration project, China Transformer Corporation has entered a breakthrough in the development trend. The commodity voltage grade and volume rank first in the world occupying the main technical position of the industry development trend. In addition, it has promoted the continuous improvement and perfection of the technology of low-voltage transformers.

ZyAccording to statistics, to occupy the main global technical position, the transformer industry depends on two key data, commodity volume and voltage level. As early as & ldquo; Eleventh Five Year Plan; In the early stage, China has been a powerful country in the production,Products Show manufacturing and application of dry-type transformers all over the world, but it is not a big country.

The cycle time of power-off cleaning and inspection shall be determined according to the surrounding environment and load conditions, generally from half a year to once a year;


KumenCapacity



If the input of dry-type transformer is an alternating switching power supply its output voltage is directly proportional to the coil turn ratio of the output input solenoid coil. If a rechargeable battery is used, because it is DC, add a circuit in the input power supply circuit to change it into a continuously changing voltage. In that way, the alternating DC current can be obtained at the output end.

xFrom the appearance, the packaging types are different. The transformer core and electromagnetic coil can be seen immediately for dry-type transformer, and only the shell can be seen for oil immersed transformer;

NTransformer manufacturer

OWelcome calls The secondary inductive equipment of the distribution station (such as transformer, voltage transformer, automobile relay,Products Show AC contactor, etc.) operates normally. According to the AC current,CologneBuried box transformerAnalysis of the current situation of flaw detection the winding transformer core will send out a symmetrical rhythm and a certain tone & ldquo; Buzz, buzz & rdquo; Sound. The operation staff of the transformer manufacturer should understand and grasp the characteristics of the noise. When the equipment has common faults, there will be noise and even & ldquo; Crackle & rdquo; The charging and discharging sound can distinguish the generation and characteristics of common equipment faults according to the music law and sound transformation when everything is normal and abnormal.

oFHow to select dry-type transformer

The specific contents include eliminating the shortcomings found in the patrol inspection, cleaning the porcelain waterproof casing, removing and replacing the cracked or brittle leather pad, checking and tightening the nodes, replenishing the oil with less oil, checking and replacing the silica gel of the breathing mask,Power transformer price: 1000KVA, 33kV, 25kV, power transformer, oil immersed transformer, dry-type transformer factory etc.


KumenCapacity



What is the cause of power transformer core failure?

RangemTransformer manufacturer

CThe sampling container is a colorless glass bottle with a wide mouth ground glass plug with a volume of .kg or kg. - bottles shall be collected at a time for analysis and experiment. Labels shall be attached during sampling. Pay attention to the name, source, sampling date, sampling person, weather conditions and other materials of the oil sample.

Overtemperature alarm and trip: collect winding or iron core temperature data signals according to the temperature measurement resistor of PTC discrete system thermistor embedded in the bottom voltage winding. When the transformer winding temperature rises again, if it reaches ℃, the system software outputs the overtemperature alarm system; If the temperature rises to ℃ again and the transformer can no longer operate, the overtemperature trip data signal must be transported to the secondary maintenance circuit, the system software automatically starts the centrifugal fan for refrigeration; When the winding temperature is as low as ℃, the system software will automatically terminate the centrifugal fan.

gMThe visual inspection method is that the staff use human eyes to observe the appearance change of the visible parts of the operating equipment to find out the abnormal conditions of the equipment, such as discoloration, deformation, cracking loosening, broken strand disconnection, short-circuit fault marks, hanging of dirty things, etching and turbidity, etc. can be checked according to the visual inspection method. Therefore, visual inspection is one of the common methods of equipment inspection.

The transformer manufacturer said that the temperature display equipment: the temperature change value is measured according to the PT temperature sensor embedded in the bottom voltage winding to immediately indicate the winding temperature of each phase (three-phase safety inspection and Zui large value indication, and the historical time Zui high temperature can be recorded). The Zui high temperature can be input and output as mA analog quantity. If it is to be transmitted to a distance (the distance can reach m, the electronic computer can be equipped with an electronic computer socket, an intelligent transmitter, and transformers can be detected. The over temperature alarm and trip of the system software can also be signaled by the resistor data of Pt thermistor sensor, so as to further improve the stability of the temperature maintenance system software.

TAGSlabel:Products Show

Copyright Notice:Transformer plantProvidedKumenCapacity specification of power transformerWhat should be paid attention to during useIt comes from the Internet and is only used for display purposes, and does not guarantee the accuracy, validity, timeliness or completeness of such information. The copyright of some pictures and text still belongs to the original author. If you infringe on your rights, please contact us and we will delete it within 24 hours as soon as possible. We only provide free services, relatedKumenCapacity specification of power transformerWhat should be paid attention to during useIt also does not indicate the views or opinions of this website, and has no reference value. Thank you.